Concrete is the most used material in civil engineering, with the recent need to achieve a concrete of higher strength at the lowest cost possible all around the globe, it is best that one go back ...

 · To find out the volume of concrete, you need to measure the height x length x width of the slab for a footpath, driveway or other structure. This will tell you the cubic meters of concrete required, with 1 cubic meter equalling 1,000 litres. How to calculate the cost of your concreting project. The cost of concreting for your project will ...

How to calculate cubic yards of concrete | how much concrete do you need. Cubic yard is one of the most popular, oldest, non- standard unit based on imperial/ US customary measurement system used for measurement of volume of material which is widely used in United States, Canada and some Imperial states in United kongdom, do not very popular in European …

 · 🕑 Reading time: 1 minute Quantity of materials such as cement, sand, coarse aggregates and water required per cubic meter of concrete and mortar for different mix proportions varies with the mix design of the concrete and mortar respectively. Following table gives the estimated quantity of materials required per cubic meter of mortar and concrete for …

How Many Cubic Meters Of Concrete Do I Need – The concrete you need depends on the area to be worked on. For foundation concrete to cover 1 cubic metre you need 6 x 50kg bags cement and tonnes ballast. … how much water is required to make 380 cubic meters of concrete? … Concrete is a composite material construction material composed ...

Volume of sand & aggregate required for 50 kg cement bag for M25 grade of concrete. As we find 11 bags of cement,18 cft sand & 36 cft aggregate for 1 cubic metre of m25 grade of concrete. Hance 11 bags cement = 18 sand. For 1 bag …

 · Example calculation Estimate the quantity of cement, sand and stone aggregate required for 1 cubic meter of 1:2:4 concrete mix. Ans. Materials required are 7 nos. of 50 kg bag of cement, 0.42 m 3 of sand and 0.83 m 3 of stone aggregate.

Hence, to prepare 1 cubic meter of M20, M15 and M10 concrete, 1.57 cubic meters of "total dry volume" of cement, sand and aggregate are needed, whereas to prepare 1 cubic meter of M7.5 and M5 concrete, 1.52 cubic meters of "total dry volume" of cement, sand and aggregate are needed. Many websites are giving different values for the "total dry volume" of the ingredients.

How many 25kg bags of ballast in a cubic metre - Civil Sir. Ballast is coarse aggregate, mixture of small rocks, limestone, crushed gravel and fine sand particles, In this regard, "how many 25kg bags of ballast in a cubic metre", generally, there are 58 bags of 25kg ballast or 1.7 jumbo bag (bulk bag of 850kg) in a cubic metre concrete by using standard mix of 1:5 (1 cement:5 ballast).

 · Building Materials Machinery Applications Mixers Crushers Tests & consulting After-sales Sales Showroom Recycling & Environment Solutions Machines Tests & consulting After-sales Sales Showroom Company About us Management Company Group Corporate history Contact Showroom Careers

Volume of sand & aggregate required for 50 kg cement bag for M25 grade of concrete. As we find 11 bags of cement,18 cft sand & 36 cft aggregate for 1 …

 · Materials quantities for cement, sand, coarse aggregates and water necessary for per cubic meter of concrete and mortar differentiate with the mix design of the concrete and mortar relatively. Given below, the predictable …

 · calculating the quantity of cement, sand, aggregates in M25 grade concrete, estimate of M25 grade concrete, how much material in 1:1:2 mix concrete.

 · Calculation of volume of concrete for beams:-. Beams are generally in a rectangular shape, to calculate the volume of concrete required for beams calculate the top or bottom surface area of the beam and multiply with the depth of beams. Volume of concrete for rectangular beam = Surface area x Depth = length x width x depth = 4×0.5×0.4=0.8m 3.

Ans. :- 0.154 m3 ( cubic meter) cement required for 1 cubic metre of M10 concrete. How much cement required for M10 concrete in Kgs. step 5:- calculate cement required for 1 cubic metre of M10 concrete in Kgs ( kilogram) is equal to = 1/10 × 1.54 m3 × 1440 Kg/m3 = 222 Kgs. Ans. :- 222 Kgs quantity of cement required for 1 cubic metre of M10 ...

 · Quantity of aggregate in cubic feet = 3 x 1.54 /5.5 x 35.3147 = 29.66 cu.ft. Water: For M20, 30 liters of water per 50kg cement . Total amount of water required = 30 x 403.2 / 50 = 241.92 litre. 8.064 bags of cement required for 1 cu.m of M20 grade concrete. 630 kg of Sand required for 1 cu.m of M20 grade concrete.

Both of these concrete calculators make an allowance for the fact that material losses volume after being mixed to make concrete. Calculator are provided for a general mix and a paving mix, the different ratio of materials are: General mix - 1:5 cement:all-in ballast or 1:2½:3½ cement:sharp sand:gravel. Paving mix - 1:3½ cement:all-in ...

If you want to calculate the volume of concrete required for a rectangular slab, use the rectangular slab calculator. To find cubic metres needed to fill a round hole. EXAMPLE: How much concrete is needed to fill 5 holes 1200mm deep and 1050mm round? ANSWER: One hole takes 1.039 cubic metres, therefore 5 holes = 5 x 1.039 = 5.195. (say 5.2 ...

 · Calculation Of Materials For Different Mix Ratio: Quantity estimation of building materials is essentially required in any construction works and quantity of materials depend on the mix proportions of the concrete. In our previous …

 · None. Concrete may be formed without metal.If you are reinforcing the concrete with rebar then it depends on what loads the reinforced concrete will have to bear, the dimension of the rebar, the safety factor involved, and lots of other geometric factors.Steel bars quantity will be according to structure element; but a (very) rough average of 120 KG per cubic meter.

Maximum quantity of steel required for 1m3 concrete beam is 2%, now 2% of 1m3 = 0.02m3, and we know that 1m3 steel weight is 7850 Kg, so weight of 0.02m3 steel = 0.02 × 7850 = 157 kg, so maximum quantity of steel required for 1m3 concrete beam is 157 Kg. Quantity of steel required for 1m3 concrete Column. Thumb rule for steel in slab = 2% to 4%.

05 Jan How to calculate volume or cubic meters (m3) BY Handy Mick IN Uncategorized 1 COMMENT. How to calculate volume or cubic meters (m3) In many cases we need to order or get delivered some materials to our home or to our work site, some materials used that may need to be calculated are, concrete, garden mix, mulch, topsoil, sand, compost, manure, road base, …

Use the Readymix Concrete Volume Calculator to calculate the volume of concrete you require for your job. If you are not sure of how to calculate the volume of different shapes, you can use the Common Shape Calculator which will provide you with the appropriate equations. *1m³ minimum order value. 1. Calculate your volume. 2. Choose your project.

A cubic metre of sand is required for 1 cubic metre of M15 concrete. Ans. : One cubic metre of M15 concrete requires 20 cu ft (0.44 m3, 713 kg) of sand. For 1 cubic metre of M15 concrete, 39 cubic feet of aggregate are required. Cement required for M15 concrete makes up 4% of the total material cost. Sand makes up 60% and aggregate makes up 36%.

Volume of sand & aggregate required for 50 kg cement bag for M20 grade of concrete. As we find 8 bags of cement,19 cft sand & 37 cft aggregate for 1 cubic metre of m20 grade of concrete. Hance 8 bags cement = 19 cft sand. For 1 bag of cement = 19/8= 2.375 cft sand. Hance 8 bags of cement = 37 cft aggregate.

 · Calculation Of Materials For Different Mix Ratio: Quantity estimation of building materials is essentially required in any construction works and …

 · Weight of 1 cubic meter of concrete:- 1 cubic metre of concrete weight around 2.5 metric ton (2500kgs), typically 1m3 of concrete is made up of about 350kg (7bags) cement, 700 kg sand, 1200kg aggregate, about 150 litres of water and 100kg of steel embedded in it as per design structure in case reinforced cement concrete (RCC concrete).

 · The quantity of plastering material needed in the above example is 2 cubic meters (m3). When it is made with a cement/sand ratio of 1/4 there will be 1 part of cement, 4 parts of sand, so 5 parts in total. Therefore, the amount of sand needed is 4/5 x 2 m3 = 1.6 m3. The rest (2.0-1.6) = 0.4 m3 is cement.